This year, the mall operator installed solar rooftop projects in Robinsons Place Santiago in Isabela and in Robinsons Place Butuan in Agusan del Norte as the 22nd and 23rd malls powered by solar.
Starting its operations in June, the Butuan solar project has a total of generated 317,536.25 kW-hr, translating to 225.04 MT of avoided CO2 emission, which is equivalent to 3,721 trees planted.
Robinsons Place Butuan has an installed total capacity of 1,296.00-kWp. The mall is located at the center of commerce and trade at the CARAGA Region which comprises of Agusan Del Norte, Agusan Del Sur, Surigao Del Norte, Surigao Del Sur, and the Dinagat Islands.
(From RLC article)
Capacity
Location
CARBON EMISSIONS AVOIDED PER YEAR
Empower your future
Address
Unit 2604, 88 Corporate
Center Sedeño St. cor
Valero St. Salcedo Village,
Makati City
Telephone
+63 (2) 70016583
All rights reserved © Upgrade Energy Philippines, 2023 • Created by Creative Coconut Ph
All rights reserved © UGEP Energy, 2023
Created by Creative Coconut Ph